 NEED: The
creek separates the new school building
from the ball
field.
A
culvert and gravel have been installed . Flooding has forced us to
add a temporary wooden structure until a more permanent concrete
structure with sidewalk and railings can be constructed.
GOAL: To have bridge completed by summer 2012.
ESTIMATED COST: $2500 |